AV8 min readPublished 20 Oct 2026

Meeting room AV in the UAE: what goes into the package

A meeting room AV package in the UAE has six parts: the display, the microphones and audio processing, the camera, the UC platform or codec, the room control system, and the network and cabling interface to the ELV package. Specify each one as its own line, with programming and commissioning separate, and every supplier prices the same room.

This guide is written for fit-out contractors, consultants and procurement teams buying meeting room and boardroom AV in Dubai, Abu Dhabi and the other emirates. It covers what each component does, what the RFQ has to state about it, and how to read the bids that come back.

Mahmoud El Sagheir, Founder and CEO, RFQsNow

Runs AV and ELV sourcing across GCC residential and commercial projects, including a confirmed AED 1.65M award in Dubai. Writes about what actually works in UAE procurement.

Mahmoud El Sagheir on LinkedIn

What goes into a meeting room AV package?

Every meeting room package is built from the same components, whatever the brand. What changes between a huddle room and a boardroom is the size, the coverage and the depth of control, not the list itself. Fixing the list first is what makes supplier quotes comparable.

Meeting room AV components and what the RFQ must state
ComponentWhat it doesWhat the RFQ must state
Display or projectorShows content and far-end videoSize, resolution, rating for daily use, mounting
Microphones and DSPPicks up speech and removes echoCoverage per room, ceiling or table, tuning included
LoudspeakersPlays far-end audioCeiling or display-integrated, coverage per room
CameraFrames the people in the roomFixed or PTZ, field of view, platform certification
UC platform or codecRuns the callWhich platform, licences and who supplies them
Room controlOne interface for the whole roomPanel, processor, programming, interfaces to other trades
Network and cablingConnects every devicePoE budget, VLANs, who supplies switches and cabling

How do you specify the display?

Size the display to the room depth and the farthest seat, not to a standard size. State a commercial display rated for extended daily use rather than a consumer television, the resolution, and the mounting: wall, floor stand or ceiling. In larger boardrooms a dual display or a projector with a screen may suit better, and the RFQ should say which. Name the specified model and say whether an approved equal is allowed, so a substitution is flagged instead of hidden in the total.

Ceiling microphones and DSP: when are they worth it?

Ceiling microphone arrays cover a whole table from above, so the table stays clear and nobody has to lean toward a puck. They need a digital signal processor (DSP) for echo cancellation and tuning, which is labour as much as hardware. For a small huddle room a video bar with built-in microphones is often enough. For boardrooms, large tables and rooms with hard finishes, a ceiling array with a tuned DSP is usually the reliable answer.

Which camera and UC platform should the RFQ name?

Decide the UC platform before the RFQ goes out, because the camera, the codec and the licences all follow from it. A fixed wide camera suits small rooms. A PTZ camera or a multi-camera setup with speaker tracking suits boardrooms. Ask suppliers to confirm platform certification for every device, and to state who supplies the licences and for how long, because licence terms are a common gap between bids.

What should a meeting room control system include?

A meeting room control system puts the room behind one touch panel: start the meeting, switch sources, set volume and camera presets. Integrated control can also set lighting scenes, lower blinds and show room booking. Most of the cost and most of the risk sit in programming, so specify the panel and processor as hardware lines and the programming, interface design and revisions as a separate line.

Lighting control often runs through the same panel, so read the lighting control systems guide alongside this one on integrated fit-outs.

Where does the AV package meet the ELV package?

The network is the boundary most often left unclear. Modern meeting room devices run on the building network, so the RFQ must say who supplies the PoE switches, the VLAN and IP configuration, and the structured cabling to each device. If both the AV and ELV packages price it, you pay twice. If neither does, the gap appears on site. Write the split on both packages, and use the structured cabling RFQ guide for the cabling side.

Meeting room AV RFQ checklist

The first sample in the RFQ examples shows a meeting room and boardroom package written out this way, and the free RFQ template gives you the blank file.

How do you compare meeting room AV bids?

Compare per room type and per line, not on the total. Check that each bid prices the specified device or a flagged equal, that programming and commissioning are included on the same basis, and that the licence term matches. The full method, including how to treat substitutions and lead times, is in the guide on how to compare AV supplier bids. For budget planning before bids arrive, the AV system cost guide for the UAE sets out indicative ranges by room type.

Frequently asked questions

What equipment does a meeting room AV system need?

A typical UAE meeting room needs a display or projector, a conference camera, microphones (often a ceiling microphone array with a DSP), loudspeakers, a UC platform or room codec, and a control system with a touch panel. Cabling, programming, commissioning and training complete the package.

Do I need ceiling microphones in a meeting room?

Not always. Small huddle rooms often work with a video bar that has microphones built in. Ceiling microphone arrays with a DSP suit larger rooms, boardrooms and rooms with a clean table, because they cover the whole table without desk clutter. The room size, seating and acoustics decide it.

What does a meeting room control system do?

A room control system gives users one touch panel to start a meeting, switch sources, set volume and camera presets, and, when it is integrated, set lighting scenes and blinds. Its cost sits largely in programming and interface design, so those belong on their own RFQ lines.

How much does meeting room AV cost in the UAE?

It depends on the room tier, the brand position and the control scope. Indicative planning ranges by room type are set out in the RFQsNow AV system cost guide for the UAE; firm prices come from suppliers pricing the same specification.

Related AV pages

Where to go next for budgets, bid comparison and UAE AV sourcing.

Post your meeting room AV RFQ

Post the room schedule and line items once on RFQsNow. Free for buyers. Verified AV suppliers matched by category and emirate return bids on the same lines, often within 18 to 48 hours.

Get started, it's free →

Are you a supplier? Find projects to bid on